Take this down with you. Every number below is what the model currently claims, so you are checking rather than starting cold. Where the model is a guess it says so.

All measurements in inches. Report anything you like as a raw number plus what you measured from — I will convert and place.


The two datums

E–W (call it x) is already authoritative. The joist grid is measured and the model matches it: interior width 394.0″ (32.83 ft) between the cinderblock inner faces. Do not re-measure this unless something looks wrong.

N–S (call it y) is NOT. The model claims interior 264.8″ (22.07 ft) north face to south face, and nothing has ever confirmed it. This is the single most valuable number on the sheet, because every post’s y-position is measured from it.

For anything E–W, report by joist rather than by tape from a wall — the joists are the accurate ruler here, and a tape run 30 ft across a basement is not. “The NW post’s east face is 2″ west of joist-07” beats “the NW post is 102″ from the west wall” every time.

For anything N–S, tape from the north interior cinder face where you can reach it, and say which face you measured from if you had to use the south.


1. Interior N–S dimension — the priority

Measure cinder inner face to cinder inner face, north to south, at three E–W positions: near the west wall, near the stairs, and in the east/utility zone where the block is bare.

Where Model claims You measure
West / den zone 264.8″  
Center / stairs 264.8″  
East / utility (bare block) 264.8″  

The model has one number for all three, which is almost certainly wrong given the house grew in phases. Three different readings are a finding, not a problem.

Note the surface you hit. basement-structure.md records that the east/utility side has a heavy timber sill on a parge bed, the west/den is rim-only behind paneling, and the centre has a doubled rim. If you are measuring to paneling rather than block on the west, say so — that is roughly the 8″ estimate the current width depends on.

2. Joist spans, N–S

The joists run north–south. The model gives the two main beams a length of 271.0″, which against a 264.8″ interior implies about 3″ of bearing at each end.

Measure the full length of a joist at three E–W positions, and note how much sits on the sill at each end if you can see it.

Joist Model length You measure Bearing N / S
One in the west/den field (joist-05…08) 271.0″    
joist-12 or joist-15 (the 3.5″ beams by the stairs) 271.0″    
One in the east/utility field (joist-19…22) 271.0″    

If these differ from each other, that difference is the phased-build stagger, and worth having.

3. The six posts

Named in the model, all on the Basement level. Suspect every y value — NW and N share an identical y, and SW and S are within 0.3″, which is what copy-placement looks like rather than measurement.

Post Model x Model y From N face Nearest joist (model)
NW post 384.5 322.9 76.7″ 3.0″ west of joist-07 (387.5)
SW post 366.5 418.7 172.5″ between joist-05 (355.1) and joist-06 (371.1)
N post 455.4 322.9 76.7″ between joist-11 (451.3) and the joist-12 beam (459.6)
S post 455.1 419.0 172.8″ same bay as N post
NE post 560.4 326.8 80.6″ 1.5″ west of joist-19 (561.9)
SE post 560.1 399.0 152.8″ same as NE post

For each post, record:

Post Details

The posts are likely all the 3.5 inch metal poles, but the four westernmost are encased in wood. It looks like 1x6 wood planks that have been cut as necessary to fit decently then decoratively stained, they are almost certainly not actual 6 inch posts.

Individual wood-encased post details first:

Measuring south to north distances are tricky:

On the utility side the west-east girder resting on the chimney assembling and the east cinder wall is made up by two adjacent 2x10s. The combined two 2x10s are almost the exact width of the metal pole but may be shy a few milimeters. The two combined in one spot measures 3 and 5/16ths across.

Measuring from the crack between the two 2x10s (so roughly in the center of the SE pillar) to the south cinder wall is almost exactly 115 inches. The SE pillar is almost directly below joist 19, with its west-face essentially exactly above the W-E center of the pillar. It is then 157.25 inches from the center between the two 2x10s to the north cinder wall face, leaving us with 272.25 total north-south distance between raw cinder at the east pillar pair

The joists stagger (if that’s an appropriate word - one joist ends, a next begins) atop the south girder / main beam in the utility side. So joist 19’s north part sits on the east side of the south part, annoying not touching, with maybe 1/8ths of space between them. I thus have no confidence that they are in fact perfectly parallel and aligned with each other.

At the NE pillar joist 19’s north part is not quite immediately atop the pillar. There is a 6x6 inch metal plate atop the metal pole, which you would think probably should be centered, yet it is not! On the north-south direction there is an inch and a half from the north edge of the plate to the metal pole, while only 1 inch exactly on the south part. The east-west side is nicely centered. The east part of the plate is almost aligned directly above the west face of joist 19’s northern part. There is almost exactly 89 inches from the south edge of the plate to the north bare cinder wall.

Measuring round two

West posts are easily accessible

Middle posts not so much, especially the N post embedded in the bar top and hidden from the north wall by the basement bathroom

The northern girder appears to be 3 and 1/8th thick, which again might mean it is two 2x10s - it is a little difficult to be sure as the underside is encased in more wood paneling. On the carpeted / den side of the basement the joists appear contigouos from the south wall until they hit the south face of the north girder

Measuring round three

The basement bathroom has a void between its north wall and the basement north wall (holds the main drain stack). I measured within the void and got some more bathroom numbers

Watch for the two easy-to-miss ones. Per the notes, the middle pair sits by the stairs with one embedded in the bar, and the east pair is low-profile and obvious in person but invisible in the 2D plan.

4. Beam lines — the open question from basement-structure.md

The structure notes say the beams do not form one line, and the exact latitudes were never pinned. This is the other half of nailing the posts, because a post sits under a beam.

5. Chimney

The model has an unnamed 36″ × 24″ block at x 550.3, y 380.2 — that is almost certainly the chimney, but nothing says so. Confirm the footprint and its position relative to the nearest joist and to the north face.

Does the east cross-beam bear on the chimney, or into a pocket beside it?

6. Stairs

Model: 36″ wide × 96″ long, at x 478.9, y 412.5, which puts it between the two 3.5″ zone-edge beams. Confirm width and run length, and its position relative to joist-12 and joist-15.

7. The through-holes

You mentioned holes going through from basement to main floor. These are worth more than anything else on this sheet, and the duct scheme already names one of them as the shared datum: a single point piercing both the basement ceiling and the main-floor wall cavity registers the two coordinate frames against each other, exactly the way the joists do within one level.

For each hole you can find:

Two of these on opposite sides of the house would let me register the whole main floor to the basement rather than to a traced background image, which is the actual cause of the few-inch wall drift and the crawlspace gap.


What I will do with it

  1. Set the interior N–S dimension per zone and correct the joist spans.
  2. Re-place all six posts against the joist grid E–W and the measured north face N–S.
  3. Pin the three beam latitudes.
  4. Name the unnamed members. Most basement structure is currently modelled as objects literally called Box — the chimney, the girders, several posts. That is why the plan is hard to read and why the 6th post went missing once already. Naming them costs nothing and makes the next session cheaper.
  5. If you get the through-holes, re-register the main floor to the basement and re-run Eldr — the crawlspace and void gaps should shrink on their own.

Anything you cannot reach, say so and I will leave it flagged rather than guessing. A known gap is worth more than a plausible number.