Basement measuring sheet — posts, joist spans, chimney, stairs
Take this down with you. Every number below is what the model currently claims, so you are checking rather than starting cold. Where the model is a guess it says so.
All measurements in inches. Report anything you like as a raw number plus what you measured from — I will convert and place.
The two datums
E–W (call it x) is already authoritative. The joist grid is measured and the model matches it: interior width 394.0″ (32.83 ft) between the cinderblock inner faces. Do not re-measure this unless something looks wrong.
N–S (call it y) is NOT. The model claims interior 264.8″ (22.07 ft) north face to south face, and nothing has ever confirmed it. This is the single most valuable number on the sheet, because every post’s y-position is measured from it.
For anything E–W, report by joist rather than by tape from a wall — the joists are the accurate ruler here, and a tape run 30 ft across a basement is not. “The NW post’s east face is 2″ west of joist-07” beats “the NW post is 102″ from the west wall” every time.
For anything N–S, tape from the north interior cinder face where you can reach it, and say which face you measured from if you had to use the south.
1. Interior N–S dimension — the priority
Measure cinder inner face to cinder inner face, north to south, at three E–W positions: near the west wall, near the stairs, and in the east/utility zone where the block is bare.
| Where | Model claims | You measure |
|---|---|---|
| West / den zone | 264.8″ | |
| Center / stairs | 264.8″ | |
| East / utility (bare block) | 264.8″ |
The model has one number for all three, which is almost certainly wrong given the house grew in phases. Three different readings are a finding, not a problem.
Note the surface you hit. basement-structure.md records that the east/utility side has a heavy timber sill on a parge bed, the west/den is rim-only behind paneling, and the centre has a doubled rim. If you are measuring to paneling rather than block on the west, say so — that is roughly the 8″ estimate the current width depends on.
2. Joist spans, N–S
The joists run north–south. The model gives the two main beams a length of 271.0″, which against a 264.8″ interior implies about 3″ of bearing at each end.
Measure the full length of a joist at three E–W positions, and note how much sits on the sill at each end if you can see it.
| Joist | Model length | You measure | Bearing N / S |
|---|---|---|---|
| One in the west/den field (joist-05…08) | 271.0″ | ||
| joist-12 or joist-15 (the 3.5″ beams by the stairs) | 271.0″ | ||
| One in the east/utility field (joist-19…22) | 271.0″ |
If these differ from each other, that difference is the phased-build stagger, and worth having.
3. The six posts
Named in the model, all on the Basement level. Suspect every y value — NW and N share an identical y, and SW and S are within 0.3″, which is what copy-placement looks like rather than measurement.
| Post | Model x | Model y | From N face | Nearest joist (model) |
|---|---|---|---|---|
| NW post | 384.5 | 322.9 | 76.7″ | 3.0″ west of joist-07 (387.5) |
| SW post | 366.5 | 418.7 | 172.5″ | between joist-05 (355.1) and joist-06 (371.1) |
| N post | 455.4 | 322.9 | 76.7″ | between joist-11 (451.3) and the joist-12 beam (459.6) |
| S post | 455.1 | 419.0 | 172.8″ | same bay as N post |
| NE post | 560.4 | 326.8 | 80.6″ | 1.5″ west of joist-19 (561.9) |
| SE post | 560.1 | 399.0 | 152.8″ | same as NE post |
For each post, record:
- E–W: which joist it sits nearest, and the offset from that joist’s face — “west face of the post is 2¼″ east of joist-07’s east face.”
- N–S: tape from the north interior cinder face to the post’s north face, and give me the post’s depth so I can derive the rest.
- Actual size and material. The model says 6×6 for all six. Confirm — a steel lally column is ~3.5″ diameter and would change both the geometry and how it reads in the plan. Wood 4×4 versus 6×6 matters too.
Post Details
The posts are likely all the 3.5 inch metal poles, but the four westernmost are encased in wood. It looks like 1x6 wood planks that have been cut as necessary to fit decently then decoratively stained, they are almost certainly not actual 6 inch posts.
Individual wood-encased post details first:
- SW: 6 and 1/16ths inches across from east to west, 5 and 3/8ths from north to south
- NW: 6 and 3/16ths inches across from east to west, 5 and 3/16ths from north to south
- N: 5 and 3/16ths inches across from east to west, 6 and 3/16th from north to south
- S: 6 and 1/4rga inches across from east to west, 5 and 5/8ths from north to south
Measuring south to north distances are tricky:
- Utility room side has raw cinder walls, but also circular metal poles that are hard to measure against
- Carpeted side (den etc) has nice solid faced posts, but not raw cinder leaving an undetermined thickness going beyond the cinder face
On the utility side the west-east girder resting on the chimney assembling and the east cinder wall is made up by two adjacent 2x10s. The combined two 2x10s are almost the exact width of the metal pole but may be shy a few milimeters. The two combined in one spot measures 3 and 5/16ths across.
Measuring from the crack between the two 2x10s (so roughly in the center of the SE pillar) to the south cinder wall is almost exactly 115 inches. The SE pillar is almost directly below joist 19, with its west-face essentially exactly above the W-E center of the pillar. It is then 157.25 inches from the center between the two 2x10s to the north cinder wall face, leaving us with 272.25 total north-south distance between raw cinder at the east pillar pair
The joists stagger (if that’s an appropriate word - one joist ends, a next begins) atop the south girder / main beam in the utility side. So joist 19’s north part sits on the east side of the south part, annoying not touching, with maybe 1/8ths of space between them. I thus have no confidence that they are in fact perfectly parallel and aligned with each other.
At the NE pillar joist 19’s north part is not quite immediately atop the pillar. There is a 6x6 inch metal plate atop the metal pole, which you would think probably should be centered, yet it is not! On the north-south direction there is an inch and a half from the north edge of the plate to the metal pole, while only 1 inch exactly on the south part. The east-west side is nicely centered. The east part of the plate is almost aligned directly above the west face of joist 19’s northern part. There is almost exactly 89 inches from the south edge of the plate to the north bare cinder wall.
Measuring round two
West posts are easily accessible
- 96.25 from south wall (wood panel face) to the north face of the SW post
- 94.128 from south face of SW post to north face of NW post
- 89.5 from south face of NW post to wood panel face of north wall
- SW post west face is about 1.5 inches further west than the west face of joist 6
- NW post west face is about 5/8ths from the east face of joist 6, so for sure the posts are not E-W aligned, but close
Middle posts not so much, especially the N post embedded in the bar top and hidden from the north wall by the basement bathroom
- 97 inches exactly from south wall to north face of S post
- 87.75 from north face of S post to north face of N post
- 44 and 3/8ths from north wall to door frame north face by the basement bathroom
- 2.5 inch across the door frame trim
- 29 inches across the door opening
- 2.5 inches across the southern door frame trim
- 1.5 inches from south face of south door frame trip to the north edge of the bar counter
- 1.75 inches from edge of bar counter to the end of some wood siding decor
- 1 inch exactly BACKWARDS from the south edge of the wood decor to the actual outer face of the south wall of the bathroom (yet another different kind of wood paneling)
- 2.5 inches from the south face of the outer bathroom wall to the north face of the N post (so 3.5 inches from the edge of the bar counter, or 5 inches from the door opening)
- For completeness to also start making the basement bathroom accurate: the north face of the bathroom inner south wall is about a quarter inch more south than the door opening. So in theory we should be able to accurately place that wall including its thickness
- The S post east face roughly lines up with the east face of joist 12 - the 3.5 inch thick beam
- Luckily the same joist 12 goes right up to the N post, although its east face seems 2 inches from the east face of the beam, so overall 2 inches further east than the S post
- It is about 2.5 inches from the south face of the N post to the south face of the girder, the posts do again not appear to be exactly on center vs girder
- The south face of the NW post likewise is about 2.5 inches from the south face of the girder
- The north face of the NW post is tricky due to trim:
- 3 and 3/8ths from north face of girder till edge of trim
- 1.75 backwards from edge of trim to the wood paneling face that wraps the girder
- 2 inches from the north face of the NW post to the north face of the wood paneling face
- Therefore: 3.75 inches from north face of post and 3.375 inches back, meaning the girder is 3/8ths OFF the edge of the north face of the post
- That seems counterintuitive, but there may well be aanother 6 inch mounting plate embedded inside the trim and paneling that again could be offset (since we have a comfortable two inches of buffer space on the north side that could hide said mounting plate)
The northern girder appears to be 3 and 1/8th thick, which again might mean it is two 2x10s - it is a little difficult to be sure as the underside is encased in more wood paneling. On the carpeted / den side of the basement the joists appear contigouos from the south wall until they hit the south face of the north girder
Measuring round three
The basement bathroom has a void between its north wall and the basement north wall (holds the main drain stack). I measured within the void and got some more bathroom numbers
- North bare cinder to South face of triple stud stack: 5.25
- 6.125 from there to north face of scaffolding wood before drywall
- 66.5 from that north face to north face of inner south bathroom wall
- 1.75 from same north face scaffold wood to South face of North drywall inside bathroom (so void depth from cinder to inner bathroom wall face is 5.25 + 6.125 + 1.75)
- 47.25 from inner faces West to East
- 11 and 7/8th from west face of N pole to East edge of bar counter
- 2 and 7/8ths back from counter edge to outer bathroom wall West face
- 4 and 5/8ths thickness of door frame, which is as good as flush with the bathroom inner West wall, east face
Watch for the two easy-to-miss ones. Per the notes, the middle pair sits by the stairs with one embedded in the bar, and the east pair is low-profile and obvious in person but invisible in the 2D plan.
4. Beam lines — the open question from basement-structure.md
The structure notes say the beams do not form one line, and the exact latitudes were never pinned. This is the other half of nailing the posts, because a post sits under a beam.
- North girder — 3 posts, west wall → NE post, then turns north without reaching the east wall. Measure its y from the north face at both ends: level end to end, or does it step?
- East cross-beam — chimney → east wall, seated in a cinder pocket. Measure its y. The joist-15 beam is recorded as passing behind the chimney without bearing on it — confirm that, it matters structurally.
- SW beam — SW + S posts, stairs → west wall, sitting further south than the east cross-beam. Measure how much further south.
5. Chimney
The model has an unnamed 36″ × 24″ block at x 550.3, y 380.2 — that is almost certainly the chimney, but nothing says so. Confirm the footprint and its position relative to the nearest joist and to the north face.
Does the east cross-beam bear on the chimney, or into a pocket beside it?
6. Stairs
Model: 36″ wide × 96″ long, at x 478.9, y 412.5, which puts it between the two 3.5″ zone-edge beams. Confirm width and run length, and its position relative to joist-12 and joist-15.
7. The through-holes
You mentioned holes going through from basement to main floor. These are worth more than anything else on this sheet, and the duct scheme already names one of them as the shared datum: a single point piercing both the basement ceiling and the main-floor wall cavity registers the two coordinate frames against each other, exactly the way the joists do within one level.
For each hole you can find:
- E–W: which joist bay it is in, and the offset from that joist.
- N–S: distance from the north interior cinder face.
- Upstairs: where it lands relative to something permanent on the main floor — a wall corner, a door jamb, a stud you can locate.
Two of these on opposite sides of the house would let me register the whole main floor to the basement rather than to a traced background image, which is the actual cause of the few-inch wall drift and the crawlspace gap.
What I will do with it
- Set the interior N–S dimension per zone and correct the joist spans.
- Re-place all six posts against the joist grid E–W and the measured north face N–S.
- Pin the three beam latitudes.
- Name the unnamed members. Most basement structure is currently modelled as objects literally called
Box— the chimney, the girders, several posts. That is why the plan is hard to read and why the 6th post went missing once already. Naming them costs nothing and makes the next session cheaper. - If you get the through-holes, re-register the main floor to the basement and re-run Eldr — the crawlspace and void gaps should shrink on their own.
Anything you cannot reach, say so and I will leave it flagged rather than guessing. A known gap is worth more than a plausible number.