Chimney — measurements and derived position

First measured 2026-09-01/02. Approximate mockup grade, not final: the chimney’s absolute position still disagrees with its own tape chain by about 2″, and the main and second floors are drywalled so their masonry is inferred rather than seen. Good enough to lay out a stacked utility closet; not good enough to cut anything.

The chimney is the spine of the duct plan — it is what the utility cabinet routes around on all three levels, and the only element besides the stairs that pierces every floor.


What was measured

Basement — the only level with raw cinder

  Measurement
South face, east–west ~16″ — one full masonry unit, maybe a shade less in places
East face, north–south ~16″ — likewise one unit
West face to the centre wall’s east face ~1″
West face to the joist-15 beam’s east face ~1″
South face to the south cinder inner face 94″
North step-out ~one unit (8″) deeper, beginning ~12″ below the joists and continuing down

The main girder lands on a 4x4 stump atop the top block of that step.

So the basement chimney is 16 × 16 in its upper reach and 16 × 24 below the step, the extra 8″ on the north side.

On the masonry unit. 16 × 16 with a void down the middle is a chimney block (flue block) — a standard product, typically 16 × 16 × 8 with a cast opening for the flue liner. One block per course rather than four cinder blocks around a hole, which makes the void and the 16″ faces consistent rather than contradictory.

Main floor — drywalled, masonry inferred

  Measurement
South face, east–west 19.5″
East face, north–south 20.25″
South face to the stump wall’s north face 94.25″

The box is integrated into the interior wall on its north side, with a closet beyond.

That last fact explains the wrap arithmetic. Against 16″ of masonry the box carries 4.25″ of wrap north–south, but the 94.25″ reading puts only 0.75″ of it on the south — leaving ~3.5″ on the north, which is a stud wall with drywall both sides. The asymmetry is the wall, not a bad measurement.

Second floor — drywalled

  Measurement
South wall 17 5/8″
East wall 17 5/8″
North wall 18 1/4″
Gap, box north face → bathroom wall 4 7/8″ (original wood paneling inside it)
Box south face → south wall’s north face 56.5″

Derived position

Taking the stack as plumb — chimneys are — and anchoring on the basement’s 94″:

Level x y
Basement, upper (16 × 16) 501.5 – 517.5 401.0 – 417.0
Basement, lower (16 × 24) 501.5 – 517.5 393.0 – 417.0
Main, box (19.5 × 20.25) 499.75 – 519.25 397.5 – 417.75
2nd floor, box (17.625 sq) 500.7 – 518.3 400.2 – 417.8

Two positions fall out of the second-floor readings and are worth having in the model:

The basement’s 94″ and the main floor’s 94.25″ agree to three-quarters of an inch across two levels — the first independent cross-level check this house has produced.


Under the stairs — the space the closet has to live in

Measured on the wall between the staircase door and the chimney, sketched by hand 2026-09-02.

Consequence for ducting: the north bay is tall but half-blocked, and the south bay is a triangle whose headroom falls away to nothing. Only about 9–10″ of the south bay’s length has 10″ or more of clearance, so it is a place to cross, not a place to run.


Still open

Structural claims still to confirm

From basement-structure.md, unverified: